Illustrative demo metrics
Business outcomes
A clear line from faster design decisions to commercial impact.
First-time-right
0%
Target: improve specification accuracy
Spec to quote
0.0 days
Target: shorten cycle time
Quote conversion
0%
Target: improve conversion
Engineering rework
−0%
Target: reduce downstream effort
Control attachment
0%
Target: expand controls adoption
Project data capture
0%
Target: improve project intelligence
Pipeline impact
Illustrative demo metrics1
2
3
4
5
6
7
8
9
10
11
12
How each metric is measured
First-time-rightEvery submitted design stores first_time_right, engineering_review_required and engineering_changes_count against the approved revision.
Spec to quoteTimestamps captured at design_completed_at and quote_requested_at compute cycle time per project with no manual entry.
Quote conversionQuote requests and accepted quotes share the Universal Job ID, so conversion is derived from the same project record.
Engineering reworkReviewer overrides record the reason and the original algorithm recommendation, quantifying avoided correction cycles.
Control attachmentControl line items are generated in every BOM, so attachment rate is read directly from structured design output.
Project data captureThe wizard writes a complete structured project record — space, environment, electrical, contacts — reusable downstream without re-entry.
